To make hydroelectric power, you need altitude, and you need rainfall. Let’s estimate the total energy of all the rain as it runs down to sea-level.
For this hydroelectric forecast, I’ll divide Britain into two: the lower, dryer bits, which I’ll call “the lowlands;” and the higher, wetter bits, which I’ll call “the highlands.” I’ll choose Bedford and Kinlochewe as my representatives of these two regions.
Figure 8.1: Nant-y-Moch dam, part of a 55 MW hydroelectric scheme in Wales. Photo by Dave Newbould, www.origins-photography.co.uk.
Let’s do the lowlands first. To estimate the gravitational power of low-land rain, we multiply the rainfall in Bedford (584 mm per year) by the density of water
When we multiply this by the area per person (
Figure 8.2: Altitudes of land in Britain. The rectangles show how much land area there is at each height.
Let’s turn to the highlands. Kinlochewe is a rainier spot: it gets 2278 mm per year, four times more than Bedford. The height drops there are bigger too – large areas of land are above 300m. So overall a twelve-fold increase in power per square metre is plausible for mountainous regions. The raw power per unit area is roughly
Figure 8.3: Hydroelectricity.
What should we estimate is the plausible practical limit? Let’s guess 20% of this – 1.4 kWh per day, and round it up a little to allow for production in the lowlands: 1.5 kWh per day.
The actual power from hydroelectricity in the UK today is 0.2 kWh/d per person, so this 1.5 kWh/d per person would require a seven-fold increase in hydroelectric power.
Figure 8.4: A 60 kW waterwheel.
Notes and further reading
Rainfall statistics are from the BBC weather centre.
The raw power per unit area [of Highland rain] is roughly
The actual power from hydroelectricity in the UK today is 0.2 kWh per day per person. Source: MacLeay et al. (2007). In 2006, large-scale hydro produced 3515 GWh (from plant with a capacity of 1.37 GW); small-scale hydro, 212 GWh (0.01 kWh/d/p) (from a capacity of 153 MW).
In 1943, when the growth of hydroelectricity was in full swing, the North of Scotland Hydroelectricity Board’s engineers estimated that the Highlands of Scotland could produce 6.3 TWh per year in 102 facilities – that would correspond to 0.3 kWh/d per person in the UK (Ross, 2008).
Glendoe, the first new large-scale hydroelectric project in the UK since 1957, will add capacity of 100 MW and is expected to deliver 180 GWh per year. Glendoe’s catchment area is
NOTES / HIGHLIGHTS
| Color | Highlighted Text | Notes | |
|---|---|---|---|
| Please Sign In to create your own Highlights / Notes | |||
| Cover Image | Attributions |
|---|---|
| License: CC BY-NC |
Your search did not match anything in .